

Tops scraped then sanded to 180 grit. Finished with 4 coats of Danish oil
Real-time updates on our current projects
Tops scraped then sanded to 180 grit. Finished with 4 coats of Danish oil
Had a great day working for Gena at G-rise LA installing shelving ready for more stock. Installed shelving system Proposal sketch